Request for Proposals RFP No. 24-02 Yuba College, Electrical Distribution Systems, Phase I, Architectural-Engineering Services;  Status: Proposals are due on Tuesday, January 14, 2025, 1 PM Sharp

RFP 24-02 YC Elect. Dist. Systems, Phase I Upgrade, Arch. Services

RFP 24-02 YC Elect. Dist. Systems, Phase I Upgrade, Arch. Services, MS Word Format

Request for Proposals RFP No. 24-01 Unarmed Security Services;  Status: Awarded

         RFP 24-01 Unarmed Security Services 7.3.24

         RFP 24-01 Addendum With Answers

Request for Proposals RFP No. 23-12 Yuba College, Buildings 200 and 1000 Partial Renovation Project, Structural Inspections and Testing Services; Status: Awarded, Construction Phase, completion scheduled for late December 2024.

RFP 23-12, YC Buildings 200 and 1000 Partial Renovation, Struct. Spec. Inspect and Tests MS Word Format

RFP 23-12, YC Buildings 200 and 1000 Partial Renovation, Struct. Spec. Inspect and Tests PDF Format

02-119844_ DSA Form 103_A

Request for Proposals RFP No. 23-11 YCCD Interpretive Services;  Status: Awarded

         RFP 23-11- Yuba CCD Sign Language Interpretive Services

Addendum 1

Request for Proposals RFP No. 23-10 Yuba College, Buildings 200 and 1000 Partial Renovation, Construction Management Services; Status: Awarded, Construction Phase, completion scheduled for late December 2024.

RFP 22-10 YC Bldg. 200, 1000 Const. Mgmt. Quality Assurance Services

Project Drawings and Specifications Link:

https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EkWSM84prJVKm1ZI5WYM9PYBkTkp_ZP6R6cdQFCaFbmNjA?e=jObgZG

Addendum No. 1, RFP 23-10 MS Word Format

Addendum No. 1, RFP 23-10 PDF Format

Request for Proposals RFP No. 23-09 Yuba College, Buildings 200 and 1000 Partial Renovation Project;  Status: Awarded, Construction Phase, completion scheduled for late December 2024. 

RFP 23-09 Yuba College, Buildings 200 & 1000 Partial Renovation Project

RFP 23-09 Yuba College, Buildings 200 & 1000 Partial Renovation Project PDF Format

Project Drawings and Specifications Link:

https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EjtfwP_u-JJHnq4SuYZHTpsBjAKi8apnlUrQgjIaZ5lQzg?e=46AjQ5

Project Front-End General Conditions Specifications Link:

https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/Ekzzy_X51ftNoP4yRHfFRCgBk3_1yNmTD9OaQP3UopEocA?e=qUyYGM

RFP 23-09 Mandatory Pre-Bid Login Sheet

Addendum No. 1, RFP 23-09 YC Buildings 200 and 1000 Renovations

Link to Addendum No. 1 and Attachments (Including Revised Bid Form):  

https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EqQWSalacuVPvQx_HibmFJ0BesBQn_s9yAq7tf3YJGdbqQ?e=FipTXb

DSA Approved Drawings and Specifications Link:

https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EiDNLptd_DRPnxeL3-sc4SkB0RdCF59C3UaE4jBoaDaxjQ?e=aq7Mrk

RFP No. 23-09_Yuba College Bldg 200 & 1000_Addendum No.2

Addendum No.3, RFP 23-09 YC Bld. 200 and 1000 Partial Renovation Project

Link to Addendum No. 3 and Attachments:

https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/ErgNXqesqo9AitPHJ5VoTgABgkSS7Lx8T2XCgsEZafNyug?e=xuF2KQ

Proposals Tabulation Sheet RFP 23-09

Request for Proposals RFP No. 23-08 Woodland Community College Campus and Lake County Center, LED Lighting Renovations Project;  Status: Awarded, Construction Phase, Completion scheduled for January 2025. 

RFP 23-08 WCC, LCC Mult. Bld. LED Lighting Renovation Project

RFP 23-08 WCC, LCC Mult. Bld. LED Lighting Renovation Project PDF Format

Project Drawings and Specifications Link: 

https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/Eme1d7OXAZlDs_YiJoSyyPkBwQjXc1E7aRHNTzMUG7-WDw?e=Qf8AmI

Project Front-End General Conditions Specifications Link:

https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/Eg1LCtK7EAVJs1GjKa501hABKmBjYpS-GLbVYgKrJPlazw?e=aVFKye

RFP 23-08 Mandatory Pre-Bid Meeting at WCC Login Sheet

RFP 23-08 Optional Pre-Bid Meeting at LCC Login Sheet

Addendum No. 1 RFP 23-08 WCC and LCC LED Lighting Project without drawings and specs

Updated Drawings YCCD Lake County Campus Addendum No. 1

Updated Drawings YCCD Woodland Community College Addendum No. 1

Revised Specification 00 41 00 Bid Form V1

Link to Addendum No. 1:

https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/Et94fDmA4WVGvpFeJ5fJJ2EBDAFoROV_ZTuyhbO06RJxDg?e=zcRL2i

Addendum No. 2, RFP 23-08 MS Word Format

Request for Proposals RFP No. 23-07, Yuba Community College District, Unarmed Security Services. Status: Failed Procurement.  See RFP 24-01. 

RFP 23-07 Yuba CCD Unarmed Security Services

          Advertisement RFP 23-07 Unarmed Security Services

Addendum-No.-1-RFP-23-07-MS-Word-Format 3

Request for Proposals RFP No. 23-06 Woodland Community College, Repair and Paint Exterior Walls on Buildings 100, 300, 400, and 700;  Second Procurement Status: Awarded, Construction phase, completion scheduled for October 2024.

Mandatory Contractor Pre-Bid Meeting On Campus: March 4, 2024 1pm, Building 100, Room 113.  Address: 2300 East Gibson Road, Woodland, California 95776.  

RFP 23-06 WCC, Repair and Paint Ext. Walls of Bldgs. 100, 300, 400, and 700

RFP 23-06 WCC, Repair and Paint Ext. Walls of Bldgs. 100, 300, 400, and 700 PDF Format

Advertisement RFP 23-06 WCC Painting Project PDF Format

Building Drawings: https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EprD-HLbmMhLuMqc5qAIH4sBBIoCz4dZm6Mu_Y9XtecG5A?e=VUvRVvings

Paint, Caulking Product Specifications: https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EnsQvkADN7dAh0mwoFkLiEABKJgfVpD5L_t_1LBlbr04Dg?e=kNGja3Flashing and Wood Coatings

Stucco Product Specifications:  https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EgqWugG9yIBHgmepo6zW64QBS9lmZcjEjSqNnXFBWU3_bg?e=xs3PEp

Building Pictures:  https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EizCvRTgmzdIpM1CUwgLadkBs66g_5ND7K3AyujZMPyyTw?e=M3y3sD

RFP 23-06 Mandatory Contractor Pre-Bid Meeting Login Sheet

Addendum No. 1, RFP 23-06 MS Word Format

Addendum No. 1, RFP 23-06 PDF Format

ProposalsTabulation Sheet–RFP 23-06

Request for Proposals RFP No. 23-05 Woodland Community College, Repair and Paint Exterior Walls on Buildings 100, 300, 400, and 700;  Status: Failed Procurement

RFP 23-05 WCC, Repair and Paint Ext. Walls of Bldgs. 100, 300, 400, and 700

RFP 23-05 WCC, Repair and Paint Ext. Walls of Bldgs. 100, 300, 400, and 700

Drawings, Specifications: https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/ElMx4ANXHCVLnS-c-VpKW2ABYc88mLt8NoC8Gv2lis2h7A?e=aKil7g

Building Pictures:  https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EizCvRTgmzdIpM1CUwgLadkBs66g_5ND7K3AyujZMPyyTw?e=M3y3sD

Advertisement RFP 23-05 WCC Painting Project

Addendum No. 1, RFP 23-05 MS Word Format

Addendum No. 1, RFP 23-05 PDF Format

Request for Proposals RFP No. 23-04 YCCD, Yuba College, Sutter County Center, District Offices “Minimized” Remodel;  Status: Awarded, Construction Phase, scheduled for completion, August, 2024. 

RFP 23-04 YCCD District Offices Minimized Remodel, MS Word Format v1

RFP 23-04 YCCD District Offices Minimized Remodel, PDF Format v1

Division 00 Specifications-Combined Specifications

Division 01 Specifications, Combined

Link to DSA Approved Drawings and Specifications:  DSA Approved Drawings and Specifications or:

https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EsVOiD02w-RLgcc3XuXMdoIB0AcRcY6d2vJTTdu_IbZBCA?e=AfOuyFDrawings and Specifications

Link to Final Furnishings Layout for the Remodeled Space (District to directly purchase all needed furnishings, cubicles):

Future Furnishings Layout

Future Furnishings Lhttps://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EvkAXgBp7HRCsHx9bzwENG8BdaEbOcwscyeI81kPhOpuxg?e=kaMoh7ayout

Request for Proposals RFP No. 23-03 Woodland Community College, Architectural Services:  New Soccer Fields Project;  Status: Awarded.  Design Phase.  Construction planned for Spring and Summer of 2025.

RFP 23-03 Architectural Design Services, WCC Soccer Fields Project, MS Word Format

RFP 23-03 Architectural Design Services, WCC Soccer Fields Project, PDF Format

Existing Campus Site Plans and Drawings

Preliminary Early Planning Information

Addendum No. 1, RFP 23-03 MS Word Format

Addendum No. 1, RFP 23-03 PDF Format

Addendum No. 2, RFP 23-03 MS Word Format

Addendum No. 2, RFP 23-03 PDF Format

Request for Proposals RFP No. 23-02 Woodland Community College, Performing Arts and Culinary Services New Building–Theater Equipment (No Installation);  Status: Awarded, completed. 

00 41 00 – Bid Form

YCCD Division 00 Specifications

YCCD Division 01 Specifications

WCC PA Theather Equipment List

Advertisement-RFP 23-02, WCC PA Theater Equipment, PDF Format

Specifications Div 00, 01 MS Word Format

Addendum No. 1, RFP 23-02 WCC PACS Theater Equipment

Addendum 1, RFP 23-02 WCC PACS Theater Equipment Q & A RFI Items

Addendum 2, RFP 23-02 WCC PACS Theater Equipment Narrative

Addendum 2, RFP 23-02 WCC PACS Theater Equipment Q & A RFI Items

00 61 00 – Bid Bond rev 1

Request for Proposals RFP No. 23-01 Woodland Community College, Performing Arts and Culinary Services New Building–Audio Video Equipment and Installation;  Status: Awarded. Completed. 

00 41 00 – Bid Form

Advertisement-RFP 23-01, WCC PA Audio Video Equipment

Woodland PAC AVC System Drawings FFE 30May2023

Woodland PAC AVC System Specification FFE 30May2023

YCCD Division 00 Specifications

YCCD Division 01 Specifications

WCC PA, AV Equipment List

Specifications Div 00, 01 MS Word Format

Addendum No. 1 Audio Video Equipment rev. 1.1

Addendum No. 1, Q & A RFI Items, Proposal Due Date Change r1.1

Addendum No. 2_Audio Video Narrative

Addendum No. 2 Audio Video Equipment Q&A RFI Items, Revised Bid Bond Form

00 61 00 – Bid Bond v1